uedbet体育

首页 Your current location: Home news

news

NEWS

news

contact us

Location: 5F, Torch Building, No. 54 Metallurgical Avenue, Qingshan District, Wuhan, Hubei Province

Phone: 027-8656 3216

Email: sales.information@baierchina.

com

2020年春节放假通知
2020-01-17

release time:

Views:

126
The Spring Festival of 2020 is approaching. According to national regulations, the company is scheduled to take 7 days off from January 24 to January 30. Due to holidays ...
2016-03-25

release time:

Views:

164
With the formulation and implementation of various policies, the gradual improvement of the market mechanism, the energy-saving service industry has entered a rapid development track, and the size of the energy-saving service industry has steadily increased. In recent years, the industry's total output value has maintained rapid growth, and the year-on-year growth rate of the industry's output value has remained above 20% since 2009. In the future, the steel and metallurgical industries are likely to become the new development direction of waste heat power generation projects. Facing the unfavorable background of the low energy consumption industry in 2014 and the decline in energy prices, the industry's total ...
2016-01-07

release time:

Views:

369
Bayer's powerful hydraulic shear is one of the best rescue tools. It adopts the latest design and machining, heat treatment and surface treatment technology, and uses high-strength steel and aviation high-strength aluminum alloy materials. Large, small size, light weight and excellent quality. Optimized mechanical design, unique tool support, provide maximum shearing force and durability; the novel push-button switch and reliable hydraulic quick connector make this product more humane. Applicable to demolition and rescue in various places ...
2019-08-22

release time:

Views:

924
In order to enhance the sense of belonging and teamwork of the employees, so that the employees can relax in addition to the stressful work, the company carefully organized a two-day trip to the Donkey Kong River rafting. The employees also relaxed the stress and enhanced the emotional communication among colleagues. Through this tourism activity, not only enriched the amateur life of employees, strengthened the communication and cooperation between various departments, but also made the family of the Bayer Group more harmonious, thereby better improving the cohesion of the company and fully showing the team spirit. Let everyone be fuller ...
2016-03-23

release time:

Views:

141
Since March 22, the world's leading power and automation technology group has focused on showing the leading technologies and complete sets of oil control systems, analytical instruments, electrical products, communication integration and security systems in the fields of oil, gas and chemical industries in a national tour Solutions, sharing success stories with more than 1,000 users and guests and in-depth discussion of the transformation and upgrading and development direction of the petrochemical industry. At present, China has become the world's second largest oil consumer and largest oil importer, and at the same time ...
2016-01-07

release time:

Views:

458
First, according to the use of BAIER drive device classification: 1, pneumatic sleeve (also known as pneumatic sleeve) 2, manual sleeve 3, electric sleeve: sleeve with electric wrench as the driving force. 2. Classification according to material 1. Chrome-Molybdenum Steel is an alloy of chromium (Cr), molybdenum (Mo), iron (Fe), and carbon (C). It has good high-temperature processing performance and is beautiful after processing. Deep quenching, shock absorption is good, so in the industry ...
2019-08-15

release time:

Views:

208
The Wudongde Hydropower Project of China Three Gorges Group is a large-scale (1) project. The main structure of the project consists of water-retaining buildings, water-relief buildings, and diversion power generation buildings. The water-retaining structure is a concrete double-curved arch dam, with a dam top elevation of 988m and a maximum dam height of 270m. The power plant buildings are arranged in the mountains on the left and right banks, and are arranged on the river bed side. Each of them is equipped with 6 mixed-flow turbines with a single capacity of 850MW ...